Sewing on Vacation

November 18, 2012 in 100 Day Hustle, Quilts in Progress

I brought my machine with me on vacation and was able to get a bit of sewing done today!  :-)

Basting:

Quilting:

All Done?

I quilted diagonal lines on one side.  I’m trying to decide if I want to take the time to do a cross hatch.  Is it unbalanced?  Is it okay?  I think a cross hatch would be very pretty, but it’ll take awhile to do the other side… so I’m deciding. :-)

I used Quilter’s Dream batting and the entire time I kept thinking, this batting IS a quilter’s dream.  It was so soft and touchable.  I’m a little sad it’s going to be inside the quilt.  :-)